Health Risk Assessment

Projects that emit toxic air contaminants (TACs) may require a Health Risk Assessment (HRA) under CEQA. Yorke CEQA provides comprehensive HRA services to help project proponents, agencies, and consultants evaluate and mitigate health risks from construction and operations. 

Health Risk Assessment

Projects that emit toxic air contaminants (TACs) may require a Health Risk Assessment (HRA) under CEQA. Yorke CEQA provides comprehensive HRA services to help project proponents, agencies, and consultants evaluate and mitigate health risks from construction and operations. 

Health Risk Assessment Services for CEQA Projects​

In compliance with the California Environmental Quality Act (CEQA), a Lead Agency will often require that a health risk assessment (HRA) be performed if a project could generate substantial emissions of toxic air contaminants (TACs).

An HRA involves evaluation of emission sources to determine whether their toxic emissions might cause public health effects.

The California Office of Environmental Health Hazard Assessment (OEHHA) has compiled an extensive list of TACs that must be analyzed for impacts on public health. A CEQA HRA may require the inclusion of TAC emissions from construction equipment and vehicles as well as operational stationary sources.

Typical TACs quantified and evaluated in an HRA include byproducts of fossil fuel combustion, commonly natural gas, gasoline, or diesel fuel. Diesel particulate matter (DPM) comes from diesel-fueled construction equipment, trucks, and emergency generators is an especially potent carcinogen.

Other common TACs include volatile organic compounds in commercial products such as paints, adhesives, sealants, and solvents, which evaporate into the air when used.

An HRA estimates the public health impacts of TAC emissions within the vicinity of a proposed project for both short-term construction and long-term operation. In particular, an HRA evaluates the potential for impacts to sensitive receptors, which include residences, schools, daycares, hospitals, and nursing homes.

In some air districts, emissions of fine particulate matter (PM2.5), a criteria pollutant, must also be assessed. At a minimum, cancer and non-cancer acute (short-term) and chronic (long-term) impacts to the nearest residents and neighboring workers are assessed.

That said, the level of health risk modeling – screening or refined – can vary depending on the TACs being emitted, how much is emitted, and the distance to the nearest receptors.

Yorke CEQA implements the methodology outlined in the OEHHA Air Toxics Hot Spots Program Guidance Manual for Preparation of Health Risk Assessments within our CEQA risk assessments.

Typically, conservative assumptions are applied in the quantification of emissions, pollutant dispersion, hazard identification, exposure duration, and toxicity assessment.

Consistent with the guidance from the OEHHA, Yorke performs HRAs using the Hotspots Analysis and Reporting Program, version 2 (HARP2).

HARP2 is distributed by the California Air Resources Board (CARB) and is intended to facilitate the exposure duration and toxicity assessment elements of HRAs in a consistent manner. As input data, HARP2 utilizes ground-level concentrations of TACs predicted by the U.S. Environmental Protection Agency (EPA) dispersion models AERSCREEN or AERMOD, at the nearest residential, workplace, and sensitive receptors. In turn, HARP2 calculates the maximum individual cancer risk, chronic hazard index, and acute hazard index for these locations.

Yorke also performs TAC emissions calculations, Air Quality Impact Analyses, and odor analysis for CEQA.

For minor or temporary sources, such as construction-only projects, a screening HRA performed with AERSCREEN and HARP2 is normally sufficient to demonstrate that the results are below CEQA significance thresholds. Thus, the analysis would be deemed complete and a refined HRA would not be required.

A screening approach is also used for initial assessments of stationary source projects to determine whether a refined HRA is necessary.

For larger projects involving permanent stationary sources that may have long-term impacts, a refined HRA performed with AERMOD and HARP2 is sometimes required to demonstrate that risks are below thresholds.

Refined modeling may be needed because AERSCREEN uses simulated meteorological data to calculate more conservative (higher) results than AERMOD, which uses actual meteorological data for the vicinity of the project site.

For some projects, it may be necessary to conduct a mobile source HRA to determine the impacts from the neighboring transportation systems on the project. Local ambient air quality data are used if the project location (vicinity) would have proximate TAC emissions that contribute to risk in a designated impacted area.

In general, this would be the case if a project places a sensitive land use, such as a school or daycare – often caused by mixed-use residential infill developments – within a specified distance of a major freeway, a major arterial roadway, and/or railroad tracks.

In such situations, the CARB Air Quality and Land Use Handbook should be consulted for recommendations on siting distances for sensitive land uses near sources of air contaminants consistent with applicable guidance from the local Air District. Similar to a stationary source HRA, AERSCREEN would be used initially, and AERMOD would be used if necessary.

Once the health risk determinations are complete, the results are compared to Lead Agency-defined significance criteria.

school sign with school building in the backgroundIf construction and operation of a project will not expose sensitive receptors to substantial pollutant concentrations (risks), the project has a less than significant impact on public health. Whereas, if a project will cause cancer or non-cancer risks to residents, workers, and identified sensitive receptors in excess of numeric thresholds, then the project is required to incorporate mitigation measures (controls) to reduce emissions and resultant risks to below thresholds.

The results are typically compiled in a Technical Report that supports the CEQA document prepared by or under the auspices of the Lead Agency.

I Have a Project and am Ready to Get Started!