Significance Criteria and Determinations

Understanding the potential environmental impacts of a project is a critical step in the CEQA process, and determining whether those impacts are significant requires a clear, defensible approach. Yorke CEQA provides expert analysis and documentation to help Lead Agencies assess air quality and climate-related impacts using established significance criteria. 

Significance Criteria and Determinations

Understanding the potential environmental impacts of a project is a critical step in the CEQA process, and determining whether those impacts are significant requires a clear, defensible approach. Yorke CEQA provides expert analysis and documentation to help Lead Agencies assess air quality and climate-related impacts using established significance criteria. 

Significance Criteria and Determinations

Once the air quality (including health risks and/or odors) and  greenhouse gases (GHGs) impact analyses are completed, Yorke will prepare an Air Quality and GHG Technical Report that will be written in a format for easy inclusion into the California Environmental Quality Act (CEQA) Negative Declaration (ND), Mitigated Negative Declaration (MND), or Environmental Impact Report (EIR).

The report will establish the baseline air quality and GHG conditions and regulatory setting that will define what analyses are required and how the impacts will be addressed. In addition, the report will identify each of the Lead Agency’s defined significance thresholds for evaluating emissions of criteria pollutants (e.g., ozone precursors, particulates, carbon monoxide, sulfur oxides), toxic air contaminants (TACs), odors, and/or GHGs for construction and operation, as applicable.

Regulatory Thresholds

The main thresholds and standards that may need to be addressed are as follows:

  • Regional Mass Emissions Thresholds;
  • Emissions Standards by Regulation;
  • Localized Significance Thresholds (LSTs);
  • California and National Ambient Air Quality Standards;
  • Health Risk Assessment (HRA) Thresholds;
  • Carbon Monoxide Hotspots (if applicable);
  • Cumulative Impacts Analysis;
  • Off-Road and Portable Equipment Regulations; and
  • Permitting Consistency – Best Achievable Control Technology (BACT), Modeling, and Health Risk.

Although the State clearinghouse provides guidance on significance criteria for CEQA analyses, each Lead Agency may have slight variations and additional criteria that must be addressed. A summary of some typical significance criteria and technical analyses Yorke would use to evaluate project impacts with respect to each criteria is shown in Table 1 below.

Table 1: Significance Criteria and Evaluation Method
Significance Criteria Evaluation Method
Air Quality
Conflict with or obstruct implementation of the applicable air quality plan Qualitatively compare project activities and emissions to the Air District’s Air Quality Management Plan (AQMP)
Violate any ambient air quality standard or contribute substantially to an existing or projected air quality violation Compare project emissions to the mass daily significance thresholds and LSTs or conduct air dispersion modeling if warranted
Result in a cumulatively considerable net increase of any criteria pollutant for which a region is nonattainment under an applicable federal or State ambient air quality standard Compare project emissions and emissions from other new projects in the area to the mass daily significance thresholds and LSTs
Expose sensitive receptors to substantial pollutant concentrations Conduct a project-level health risk assessment (screening or refined as applicable)
Result in other emissions (such as those leading to odors) adversely affecting a substantial number of people Discuss the potential for malodorous emissions and perform an ambient air quality impact analysis
Greenhouse Gas Emissions
Generate GHG emissions, either directly or indirectly, that may have a significant impact on the climate Compare project emissions to applicable mass significance thresholds
Conflict with any applicable plan, policy, or regulation of an agency adopted for the purpose of reducing the emissions of GHGs Qualitative comparison of project activities and emissions to the overall goals of Assembly Bill 32

CEQA Analysis

The CEQA analysis is used as a tool to assist decisionmakers with whether or not to approve a project or suggesting changes that would allow approval. If a project is determined to have a potentially significant impact, additional mitigation measures can be evaluated to determine whether the impact can be reduced.

If all feasible mitigation measures have been incorporated, and the impact is still expected to be significant, then it is the prerogative of the Lead Agency and other responsible agencies to decide if a project should nevertheless be approved in spite of the significant impacts. In that case, a statement of overriding considerations must be prepared by the Lead Agency which justifies approval of the project.

I Have a Project and am Ready to Get Started!

Skip to content